SBA Certified HUBZone Contractor
MnDOT Certified ED Vendor
Aspen
  
Aspen Construction Company has a long history of completing projects on time and within budget for many facets of Government.  For general information regarding our Government Projects Division, contact governmentsales@aspen-construction.com
        Company Data

        Capability Statement

        Key Employees
Government Project Contacts:

            Brad Baird, President

            
Mark Lannon, QC/Safety Manager

           
Jon Fank, Project Manager

            Ryan Blank, Project Estimator

           
Stephanie Hegg, Office Manager
Completed Government Projects List
Click on Project Title for Detailed Description
Title Location Owner Description Completion
Date
Emergency Streambank Protection Jamestown, ND USACE Place and shape fill for bank, install riprap to protect stream bank Ongoing
Flood Damage Reduction Bristol, TN USACE Remove double 12x8x150' culvert, shape banks, install riprap, sidewalks, plaza, park benches, etc. Ongoing
Walkway Replacement
Leech Lake Recreation Area
Federal Dam, MN USACE Replace existing wooden walkway with steel grating, Refabricate guardrail system Ongoing
Ketterling's Point
Shadehill Reservoir
Lemmon, SD Bureau of Reclamation Repair existing bank, Install 6,230 cy riprap shoreline protection and 10,000 cy stock pile Ongoing
Hubbard County State Aid Highway #37 Hubbard County, MN Hubbard County 4.7 mile road reconstruction, Double 12x6 box culvert, intermittent culvert crossings Ongoing
Enders Dam
Concrete and Steel Repai
r
Enders, NE Bureau of Reclamation Raise and support bridge, Replace roller bearings, Repair fixed bearings, Structural concrete repair 9/11
Trenton Dam
Concrete and Steel Repair
Trenton, NE Bureau of Reclamation Repair existing deteriorated structural concrete, Add drain extensions, Repair eroded slope 10/11
South Bend Township
Levee Repair
Mankato, MN USACE Repair failed levee section, Repair/replace 24",30",48" and 54" RCP and precast structures 6/11
Sandy Lake Lift Station McGregor, MN MnDNR Installed new Holding Tank, Septic
System and Lift Station
11/10
Moreau Bank Stabilization Oahe Lake, SD USACE Place and shape fill, Install geotextile fabric,
Place 10,000 ton of 4000 lb. Riprap on shoreline
11/10
Pigeon River Fish Passage Chippewa National Forest US Forest Service Construct 250' Fish Passage Channel 9/10
Walker Ranger District Admin
Phase 1 - Site Work
Walker, MN US Forest Service Demo 2 buildings, Move 2 buildings, Utility Installation, Retaining Walls, Site Grading 11/10
Waubay NWR Shoreline Repair Waubay, SD US Fish and Wildlife Riprap Shoreline Repair 6/10
Lock and Dam 5
Access Road Repairs
Winona, MN USACE Sheet Piling, Deep Excavation, Drainage System, Curb & Gutter, Paving 7/10
Leech Lake Water Access Site Cass Lake,
MN
MnDNR Major overhaul of existing water access site 5/10
Leech River Boat Access Federal Dam,
MN
USACE Design and install new boat access 11/09
Beach Improvements at
Sandy Lake
Libby, MN USACE Excavate lake sediment, rebuild and
expand existing beach
10/09
Crosslake Campground Electrical Upgrade Crosslake, MN USACE Upgrade electrical service and new
50amp pedestals
10/09
Wabasha Pit Mixed Material Windrow Removal Wabasha, MN USACE Remove railroad ties, soil and woody vegetation from windrows in old gravel pit 8/09
Fountain City Service Base Building Demolition Fountain City, WI USACE Demolish building and
recycle waste
10-09
TH 71
Culvert Replacement
Park Rapids, MN MnDOT Divert water flow, remove existing culvert,
install new 36" culvert
7/09
Mucky Creek Bridge Replacement Badoura, MN MnDNR Divert flow of creek, remove steel and timber bridge, install new aluminum box culvert 6/09
Minnehaha Creek WPA Walls Minneapolis, MN USACE Divert water flow, install reinforce concrete footings and repair Historic Limestone Walls 6/09
Caraway Road Bridge Replacement Emily, MN Little Pine
Township
Divert water flow, remove existing culvert, install new 11' x 11' x 100' concrete box culvert 08
NW Sanitary Sewer Extension Remer, MN City of Remer, MN New Lift Station and HDPE Force Main 08
Public Access Parking Lot Federal Dam, MN USACE R & R Concrete Boat Ramp planks and
construct new parking lot
08
TH 94 Culvert
Repair & Replacement
Stearns County, MN MnDOT Install multiple centerline and median culverts, install culvert liners 08
Tower Ave & 2nd Street Improvements, Site Utilities Walker, MN City of Walker, MN New water and sewer mains, connection locations, fire hydrant, manholes and storm sewer system 07
TH 65
Culvert Replacement
McGregor, MN MnDOT Install centerline and entrance culverts
ranging from 18" to 36"
07
TH 18 Turn Lanes and Centerline Culverts Garrison, MN MnDOT Install centerline and approach culverts 06
Norway Beach Cell 2, Liner Removal and Replacement Cass Lake, MN US Forest Service Remove and Replace leaking PVC
Sewer Pond Liner
05
Norway Beach Lift Station Cass Lake, MN US Forest Service Install new Lift Station, PVC Sewer Main
and Laterals
05
Cass Lake Annex CG
Waterline Replacement
Cass Lake, MN US Forest Service Install new Wells, Pumping Station
and Water Main
05
Sanitary Sewer Collection System East Gull Lake, MN City of East Gull Lake, MN 25,000 lf main line sewer, 14,000 lf service lines, 235 individual connections 05
Bemidji High School Demolition Bemidji, MN ISD #31 Demolish 460' x 65' Three Story Building 04
Sanitary Sewer Phase II Construction Federal Dam, MN City of Federal Dam, MN Install  Tanks, Grinder Stations and
Sewer Force Main
03
Minisogama Road Reconstruction Pennington, MN US Forest Service Construct improvement to 5 miles of
Forest Service Roads
03
Stoney Point Road Reconstruction Walker, MN US Forest Service Reconstruct 3 miles of Roadway,
Pave and Sealcoat
03
Knutson Dam Breakwater Cass Lake, MN US Forest Service Install Riprap Breakwater and
Channel Restoration
01